Danae Class Cruiser (1917)
From The Dreadnought Project
The eight light cruisers of the Danae Class were completed between 1918 and 1922. An additional four planned ships were not completed.
Contents
Fire Control
Rangefinders
Evershed Bearing Indicators
These ships almost certainly had Evershed gear for gun control from delivery, and were the first new light cruisers to also feature Evershed installations for searchlight control.[1]
Gunnery Control
Control Positions
Control Groups
Directors
All ships were completed with gunnery directors in place.[2]
Torpedo Control
Transmitting Stations
Dreyer Table
Fire Control Instruments
[TO BE CONTINUED - TONE]
See Also
Footnotes
- ↑ The Technical History and Index: Fire Control in HM Ships, 1919, p. 29.
- ↑ The Technical History and Index: Fire Control in HM Ships, 1919, p. 11.
Bibliography
- Admiralty, Gunnery Branch (1910). Handbook for Fire Control Instruments, 1909. Copy No. 173 is Ja 345a at Admiralty Library, Portsmouth, United Kingdom.
- Template:BibUKDreyerTableHandbook1918
- Template:BibUKFireControlInHMShips1919