Difference between revisions of "U.S.S. L-2 (1915)"

From The Dreadnought Project
Jump to: navigation, search
(initialize page)
 
Line 15: Line 15:
  
 
==Service==
 
==Service==
 +
L-2 was commissioned on 29 September, 1916 with {{LtJGUS}} [Augustine Heard Gray|Augustine H. Gray]] in command.
  
 
==Captains==
 
==Captains==
 
<div name=fredbot:officeCapt otitle="Captain of U.S.S. ''L-2''" nat=US>
 
<div name=fredbot:officeCapt otitle="Captain of U.S.S. ''L-2''" nat=US>
 +
{{Tenure|rank={{LtJGUS}}|name=Augustine Heard Gray|nick=Augustine H. Gray|appt=29 September, 1916|precBy=New Command}}
 
</div name=fredbot:officeCapt>
 
</div name=fredbot:officeCapt>
  

Revision as of 14:34, 23 November 2014

U.S.S. L-2 (1915)
Hull Number: SS-41
Builder: Fore River[1]
Laid down: 19 Mar, 1914
Launched: 11 Feb, 1915[2]
Commissioned: 29 Sep, 1916
Decommissioned: 4 May, 1923
Broken up: 1932[3]
U.S.S. L-2 was one of eleven "L" Class submarines completed for the U.S. Navy.

Service

L-2 was commissioned on 29 September, 1916 with Lieutenant (Junior Grade) [Augustine Heard Gray|Augustine H. Gray]] in command.

Captains

See Also

Footnotes

  1. Conway's All the World's Fighting Ships 1906–1921. p. 129.
  2. Conway's All the World's Fighting Ships 1906–1921. p. 129.
  3. Conway's All the World's Fighting Ships 1906–1921. p. 129.

Bibliography


"L" Class Submarine
Electric Boat Design
L-1 L-2 L-3 L-4 L-9
  L-10 L-11  
Lake Design
  L-5 L-6 L-7 L-8  
<– Haddock Class Submarines (US) U.S.S. M-1 –>